During the peak of the global COVID-19 pandemic, our team was selected to deliver a fast-track design-build, multiphase, Emergency Department COVID Unit for IU Health Methodist, Indiana’s largest hospital. From the first iteration of drawings (3/13/20) to turnover (4/6/20) the renovation of the ED overflow bays was 24 calendar days. The new ICU units will become the design template for future treatment rooms throughout the hospital.
- IU Health
- Owner Directed
- Indianapolis, IN
- 2,700
- Healthcare